On the old Roman road, RH14

Fuse Box Replacement in Billingshurst

Billingshurst is a large and growing village on the A29, with an old High Street, a station on the Arun Valley line and new homes on its edges, while plenty of houses in the surrounding lanes are still heated by oil or LPG. We replace fuse boxes across the area at fixed prices, sized for the heating you are planning.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Billingshurst

Board options for Billingshurst homes

Choose the board that fits your plans. Homes moving to a heat pump or electric heating often need a full RCBO board with spare ways, and every unit we fit includes Type 2 surge protection and a test of the whole house.

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Billingshurst homes

An old High Street and a village that keeps growing

The oldest part of Billingshurst lines the High Street, which follows the course of the Roman road to Chichester, with tile hung and timber framed buildings among later brick fronts. The railway brought Victorian houses out towards the station, and the twentieth century added bungalows and estates of semis and detached homes. Large new developments have since spread across the edges of the village, so one postcode holds boards from almost every decade.

In the older houses we still meet rewirable fuse boards and boards with a separate switch for the cooker or immersion heater. Estate homes from the 1970s to the 1990s usually have one RCD guarding only half the circuits. The newest houses have modern units, though owners sometimes swap to a full RCBO board so a single faulty appliance cannot cut the power to half the house.

  • High Street period buildings
  • Victorian houses near the station
  • Bungalows and estate homes
  • New build homes on the edges
  • Rewirable fuses replaced
  • Half RCD boards fully protected
Flush mounted consumer unit mid installation with RCBOs, surge protection and neatly dressed cables
C1 & C2 defects clearedPaperwork to your agent within 48 hours
Billingshurst rentals

New build lets and cottages in the lanes

Billingshurst's rented homes reflect the way the village has grown. There are newer houses bought to let on the recent estates, family homes and bungalows let to people who want the schools or the station, a few flats above shops on the High Street, and older cottages let in the hamlets around Coneyhurst, Adversane and Wisborough Green. Each type tends to raise different questions when the EICR is due.

A new build let still needs an EICR at least every five years, though the board is rarely the problem. In older cottages it often is, along with outbuildings fed from the house and earthing that needs checking. We quote from photos, replace the board where needed and add the EICR for £99 at the same visit, or carry out a standalone EICR from £175.

  • New build lets inspected
  • Cottage lets in nearby hamlets
  • Flats above High Street shops
  • EICR £99 with a new board
  • Standalone EICR from £175
  • Outbuildings included in testing
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for BillingshurstOff the gas network
Off the gas network

When oil and LPG give way to electric heating

Beyond the village centre, many homes in the lanes and hamlets around Billingshurst have never had mains gas, relying instead on oil tanks, LPG or electric storage heaters. As those systems age, owners are switching to air source heat pumps, electric boilers or modern storage heating, all of which put a large, long running load on the consumer unit. An older board, or one with no spare ways, is often the first thing a heating installer flags.

We size the new board for the heating you are planning, with a dedicated way, suitable RCD or RCBO protection and room for an immersion heater or a car charger later. We also look at the incoming supply, because a big new load may need UK Power Networks to confirm the main fuse is adequate. Your heating installer gets clearly labelled ways to connect to.

  • Heat pump way fitted ready
  • Electric boiler circuits planned
  • Off peak circuits labelled
  • Main fuse size checked
  • Spare ways for future loads
  • Clear connections for your installer
Getting to you

Help for Billingshurst when the board fails

If your board has tripped and will not reset, there is a burning smell, or a breaker feels hot to the touch, call 0333 360 8691. We answer from 8am to 8pm, seven days a week, and will talk you through isolating the problem safely. Billingshurst sits where the A29 meets the A272, so it is straightforward for us to reach, and we aim to attend the same day where we can.

Planned replacements are booked for a date that suits you, and most boards are fitted in 4 to 6 hours. If you work from home, tell us and we will plan the power off period around your calls. Before we leave, we check that your router, alarm and heating controls have all come back on.

Billingshurst at a glance

  • PostcodesRH14, with RH13 and RH20 nearby
  • Typical homesPeriod High Street, bungalows, new estates
  • CouncilHorsham District Council
  • Common board issueNo spare ways for new heating loads
  • Earthing we seePME in the village, TT in outlying lanes
  • Getting to youFrom Brighton via the A23 and A272
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed fuse box prices in Billingshurst

The same published prices we charge everywhere in Sussex, no travel supplement. Every figure includes the board, a Type 2 surge protection device, full testing, your certificate and Part P notification.

Dual RCD board

6 way, from£425

Two RCDs each covering a bank of MCBs. The budget friendly route to full RCD protection for flats and smaller homes.

  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575

Dual RCD protection plus dedicated RCBO ways for freezers, alarms and smart home kit, so the circuits that matter never share a trip.

  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625

One RCBO per circuit. A fault trips only that circuit, fault finding is faster and nuisance tripping all but disappears. Our recommendation.

  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095

RCBOs plus arc fault detection devices for the highest level of fire protection available. The right choice for HMOs and period property.

  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

Full breakdown by number of ways on the pricing page.

Where we work in Billingshurst

Billingshurst and the surrounding hamlets

We work throughout Billingshurst and the scattered villages and hamlets around it, from Five Oaks and Adversane to Wisborough Green, Loxwood and the Shipley side. Prices are the same fixed rates wherever you live, with no mileage charge, and a clear photo of your board is enough for a quote.

Phones answered 8am to 8pm, 7 daysInstallation slots typically 3 to 5 working days out
RH14Billingshurst and close by

Billingshurst village, Five Oaks, Adversane, Coneyhurst, Okehurst, Tedfold, Newpound Common

RH14West to Loxwood

Wisborough Green, Loxwood, Roundstreet Common, Plaistow, Ifold, Alfold Bars, The Haven

RH13East to Shipley

Barns Green, Brooks Green, Coolham, Shipley, Dragons Green, Broomers Corner

RH20South to the Arun

North Heath, Broadford Bridge, Gay Street

Billingshurst High Street Five Oaks Adversane Coneyhurst Okehurst Tedfold Newpound Common Wisborough Green Loxwood Barns Green Coolham Shipley Broadford Bridge North Heath Rudgwick Plaistow
Billingshurst questions

Fuse box questions from Billingshurst

Still not sure?

Call for a straight answer from an installer, not a call centre. No pressure, no hard sell.

Call 0333 360 8691

Quite often, yes. A heat pump needs its own circuit with the right protection, and an older board may have no spare way or an RCD type that does not suit the unit's electronics. Your heating installer will also need to tell UK Power Networks about the new load. Send us a photo of the board and the installer's requirements, and we will quote a board that is ready for them, from £625 for a full RCBO 8 way.

Often it can. Homes with off peak heating frequently have a second small board or a row of switches fed through a separate meter or time switch. Depending on how your meter is arranged, we either bring the heating circuits into a new consumer unit with their own section, or replace the second board on its own. Every off peak circuit is tested and labelled, so it is as clear as the rest. Send photos of both boards and the meter.

Almost certainly not for safety reasons. A recently built home should already have a modern consumer unit with RCD protection in a metal enclosure. Some owners upgrade to full RCBO protection, or need more ways for a heat pump, battery or car charger, but that is a choice rather than a fix. Send us a photo and we will tell you honestly whether it is worth doing anything at all.

Yes. Every village and hamlet around Billingshurst gets the same fixed prices as the village itself, with no extra charge for distance. Homes along the outlying lanes are more likely to have an overhead supply and their own earth rod, so we measure the earth electrode as part of the job and choose protection that suits that kind of supply. You get the same certificate and guarantee wherever you are.

Yes. Plenty of customers let us in early, leave us to it and catch their train. Most boards take 4 to 6 hours, so the job is normally finished well before you get home. We text when we arrive and again when the power is back on, and the Electrical Installation Certificate, with anything we found explained, is emailed within 48 hours.

Ready when you are

Upgrade your Billingshurst board

Switching heating, or simply replacing an old fuse box? Text a photo of the board to 0333 360 8691 and we will reply with a fixed price for your Billingshurst home.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.