
Fuse Box Replacement in Coneyhurst
If you have solar panels on the roof, or plan to fit them with a battery, the new consumer unit should be chosen with that in mind. Here in Coneyhurst, a small hamlet just south east of Billingshurst and part of its parish, the quote we work out from your pictures is fixed.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Coneyhurst
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

A scattering of houses on the edge of the parish
Coneyhurst is a hamlet, so think of a scattering of homes rather than streets. In this part of the parish that usually means detached houses and cottages with gardens, outbuildings and a fair bit of roof space. Boards in rural homes range widely in age, and it is not unusual to find one old fuse box quietly running a house that has doubled in size.
A house that has grown needs a board that matches it. We count the circuits that are really there, including any added for a kitchen, loft or garden room, and choose a size with ways to spare. For many of the bigger country houses, the right answer is a £695 RCBO board, offering 10 to 12 ways.
- Detached homes and cottages
- Extensions accounted for
- Ways to spare
- RCBO boards from £625

Fitting a board around solar panels
Solar panels feed power back into your consumer unit through the inverter, usually on a dedicated circuit with its own isolator. When the board is replaced, that circuit has to be reconnected correctly, labelled and tested, and warning labels telling anyone who opens the board that there is a second source of supply must be in place.
Batteries add another layer, since some systems keep part of the house running in a power cut. If you have one, tell us the make when you send photos so we can check how it connects. If you are only thinking about solar, ask for a spare way now and the PV installer will thank you later.
- Inverter circuit reconnected and tested
- Dual supply warning labels
- Battery connections checked
- Spare way for future solar
Coneyhurst, minutes from Billingshurst
Getting to Coneyhurst is a straightforward drive for us: the A23 north, then west along the A272 towards Billingshurst. You pay no travel charge. We need pictures of the board, plus the inverter and any solar isolator, to give a fixed quote. Should the power go off altogether, phone, and we will look to be there that day.
Coneyhurst at a glance
- ParishBillingshurst
- CouncilHorsham District Council
- PostcodeRH14
- Nearest townBillingshurst, 2.6 km north west
- Ask us aboutSolar and battery connections
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Coneyhurst
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Coneyhurst. Full breakdown on the pricing page.
Asked in Coneyhurst
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691It should not. The panels, inverter and generation meter stay as they are, and we reconnect the solar circuit to the new board. The power will be off while we work, so the system will not generate for those hours. If your scheme asks for readings, note the generation meter before and after.
No. For safety we isolate every source of supply before working, which includes switching off the inverter and any battery. Once the new consumer unit is in and tested, we bring the solar and battery back on and check they start up as they should. The whole job usually takes 4 to 6 hours.
Not necessarily. A dual RCD board can work with solar, and starts at £425 for 6 ways. Many people choose RCBOs anyway, because a fault on one circuit then cannot switch off others, including the one the inverter is on. We will look at your system and explain which suits it before you decide.
Also covering places near Coneyhurst
Book your Coneyhurst fuse box replacement
Snap the board, the inverter and any solar isolator, and message the pictures through on 0333 360 8691. The Coneyhurst price you receive is fixed and already covers reconnecting every part of the system.
- Call, 8am to 8pm0333 360 8691
- CoverageConeyhurst: RH14