
Fuse Box Replacement in The Mount
Rusper parish takes in The Mount, a hamlet north west of Crawley. Away from the towns, some homes are heated by oil, LPG or electricity rather than mains gas. If yours is moving towards a heat pump or more electric heating, the fuse board is a sensible place to start.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for The Mount
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

Homes at The Mount and how they are wired
As a small rural settlement, The Mount has individual houses and cottages rather than an estate. Properties like these have usually been extended or modernised piecemeal, and the electrics follow the same pattern: an older fuse box serving a mix of original and newer circuits, sometimes with a separate unit added for a garage or outbuilding.
We test every circuit in the house with each board change, not just the new connections, so you learn which parts of the wiring are sound. If something fails, we explain it before going further. Prices begin at £425 for a steel dual RCD board, and your certificate follows by email inside 48 hours.
- Whole house tested
- Faults explained before work
- Outbuilding units tidied up
- Certificate within 48 hours

Heat pumps, storage heaters and the board behind them
Homes without mains gas often have higher electrical loads than town houses: storage heaters, an immersion heater, electric showers, and increasingly an air source heat pump. A heat pump needs its own dedicated circuit, and the installer will want a board with a spare way and suitable protection. An old fuse box can hold up a heat pump installation until it is replaced.
When we replace your board at The Mount, we can leave ways for a heat pump and its controls, check the main fuse rating with you, and keep off peak circuits for storage heaters correctly separated. Full RCBO protection, from £625, handles heavier, mixed loads like these well.
- Spare ways for a heat pump
- Off peak circuits kept separate
- Main fuse rating checked
- Full RCBO from £625
Booking a visit to The Mount
Our route runs up the A23 and M23, round the western edge of Crawley and on through the lanes. We do not charge for travel. Include any off peak meter in the photos of your board that you text over. Phone us about any fault that has cut your power, and we aim to attend that day.
The Mount at a glance
- ParishRusper
- CouncilHorsham District Council
- PostcodesRH11, RH12
- Nearest townCrawley, 4.8 km to the south east
- Heating to plan forHeat pumps and electric heating
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in The Mount
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to The Mount. Full breakdown on the pricing page.
Asked in The Mount
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691Not always, but often. The heat pump installer needs a spare way with the right type of protection, and many older boards have neither the space nor RCD protection. If your board is a fuse box or a crowded plastic unit, replacing it first usually makes the heat pump connection straightforward and avoids a separate add on box.
It adds planning rather than difficulty. Storage heaters and an off peak immersion are usually fed through a separate meter register or switched supply, so we trace which circuits belong where before anything is disconnected. Afterwards they are reconnected and tested so they still charge overnight on the cheaper rate.
Yes. Oil boilers need mains power for the burner, pump and controls, usually through a fused spur or their own circuit. We reconnect it to the new board, test it, and check the heating fires up before we leave. LPG systems with electric controls are handled the same way.
Also covering places near The Mount
Book your The Mount fuse box replacement
Planning a heat pump at The Mount, or just tired of an old fuse box? Either way, a quick photo on 0333 360 8691 lets us price the right board.
- Call, 8am to 8pm0333 360 8691
- CoverageThe Mount: RH11, RH12