A small hamlet in Rusper parish

Fuse Box Replacement in Lambs Green

Open countryside surrounds Lambs Green, a small hamlet in Rusper parish to the west of Crawley. Homes out here are more likely to rely on an earth rod in the garden than on an earth supplied by the network. We replace fuse boxes with that in mind, at a fixed price.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Lambs Green

Fuse box services for Lambs Green

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Scattered rural homes

Cottages, houses and farm buildings

Lambs Green is a handful of homes rather than a village street, set among the fields and lanes west of Crawley. Housing in a rural hamlet like this tends to be a mix of older cottages, detached houses and converted or working farm buildings, each with its own supply arrangement and its own history of alterations.

Because every property is different, we ask for photos of the meter, the board and the earthing arrangement before quoting. That tells us whether the supply arrives overhead or underground, whether there is an earth rod, and roughly how many circuits the new board needs to serve.

  • Older cottages
  • Detached rural houses
  • Farm buildings and conversions
  • Photos of meter and earth first
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for Lambs GreenEarthing in the countryside
Earthing in the countryside

TT earthing and why the RCD matters more

A TT earthing system is common where rural properties are fed by overhead lines: instead of taking an earth from the supply cable, the house is earthed through a metal rod in the ground. Ground conditions vary, so the resistance of that rod can be high. A fault might then not draw enough current to trip a breaker, leaving the RCD to do the protecting.

On a TT supply we measure the earth rod's resistance, check its connection and cover, and make sure every circuit sits behind an RCD. Where the reading is poor, we tell you and explain the options. Exposed overhead supplies also benefit from the Type 2 surge protection that comes with every board.

  • Earth rod resistance measured
  • Every circuit behind an RCD
  • Earth connection inspected
  • Surge protection included
Getting to you

Reaching Lambs Green

Setting out from Brighton & Hove, we head through Crawley and into the lanes to the west. Even a single remote property pays nothing towards the journey. Send us photos, plus a note on finding the house if satnav struggles. For a fault, phone us and we will endeavour to be with you that day.

Lambs Green at a glance

  • ParishRusper
  • CouncilHorsham District Council
  • PostcodeRH12
  • Nearest townCrawley, 5.3 km to the east
  • Earthing we expectOften TT, with an earth rod
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Lambs Green

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Lambs Green. Full breakdown on the pricing page.

Lambs Green questions

Asked in Lambs Green

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Look near the meter for the main earthing cable. If it connects to the supplier's cable or a terminal on their equipment, your earth comes from the network. If it leaves the house to a rod in the ground, often under a small cover outside, you have a TT system. A photo of the area around the meter usually lets us tell you.

We will not leave the installation in an unsafe state. Often an additional or longer rod brings the reading down to an acceptable level, and sometimes the existing rod is simply corroded or its clamp has worked loose. We explain the result and the remedy before doing anything further, so there are no surprises when you get the bill.

Often, yes, but a heat pump is a large load, so UK Power Networks normally has to be told about it, and on some rural supplies the capacity needs checking first. When we fit your board we can keep a spare way and record your main fuse rating and earthing, so the heat pump installer has what they need.

Ready when you are

Book your Lambs Green fuse box replacement

We price Lambs Green homes at a fixed figure with nothing added for travel: just text 0333 360 8691 photos showing the meter, any earth rod and the board.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.