
Fuse Box Replacement in Tower Hill
Part of Southwater parish, the hamlet of Tower Hill sits just south west of Horsham, near enough to feel like the edge of town. If an old fuse box is tripping, worn out or holding up a smart meter installation, we replace it at a fixed price.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Tower Hill
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

Homes on the town's doorstep
Tower Hill sits just beyond Horsham's built-up area, so its homes borrow a little from both sides: some feel suburban, others more like country properties. The boards inside can follow suit. One house may have a 1980s or 1990s unit with a single RCD, the next a set of rewireable fuses that has never been touched, often fed by meter tails that have seen better days.
Either way, the fix is a new consumer unit and, where needed, fresh meter tails between the meter and the board. Prices start at £425 for a dual RCD board, and a larger house needing an RCBO board with 14 to 16 ways pays £795; both carry Type 2 surge protection.
- Single RCD units replaced
- Tired meter tails renewed
- Surge protection included
- Larger homes on 14 to 16 ways

Clearing the way for a smart meter
A smart meter appointment can end early if the engineer finds something at the meter position they are not permitted to work around. Typical reasons include tails that are too thin or show signs of heat, no main earth, a cracked board casing, or a backing board that might contain asbestos. Until that is put right, the new meter stays in the van.
The cut-out and main fuse belong to UK Power Networks and the meter to your supplier, but the tails and the consumer unit are yours, and that is the part we sort out. Once the new board and tails are fitted and certified, you simply ring your supplier and rebook the smart meter.
- Meter tails replaced
- Main earth brought up to standard
- Certificate to show your supplier
- Network side left to UKPN
Barely outside Horsham
So close is Tower Hill to Horsham that the town's own roads bring us almost to your door. A fixed quote comes from your board and meter photos, and then you pick the date. Seven days a week, a board failure that has left you without power gets our best effort at a visit that same day.
Tower Hill at a glance
- ParishSouthwater
- CouncilHorsham District Council
- PostcodeRH13
- Nearest townHorsham, 1.6 km north east
- Common issueOld tails holding up smart meters
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Tower Hill
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Tower Hill. Full breakdown on the pricing page.
Asked in Tower Hill
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691Check the paperwork they left, which normally says what they found. Pass that on to us together with photos showing the board and the meter area. If the problem is in your part of the installation, such as the tails, the earthing or the consumer unit, we fix it at a fixed price, and you then rebook the smart meter with your supplier.
Not necessarily. Some boards of that age are still sound, though a single RCD covering everything means one fault can switch off the whole house, and many have plastic casings. If you would rather know before deciding, a standalone EICR from £175 gives a clear answer. A sound board with no surge device can have one retrofitted for £165.
Call us first, on any day of the week. Tower Hill is just outside Horsham, and if an installer is free we aim to be with you the same day. We make the installation safe first, then fit the new board either on that visit or at the earliest date we can offer.
Also covering places near Tower Hill
Book your Tower Hill fuse box replacement
Board holding up your smart meter, or simply past its best? Let us see it in a few photos, and a fixed Tower Hill price will be on its way.
- Call, 8am to 8pm0333 360 8691
- CoverageTower Hill: RH13