Small village west of Horsham

Fuse Box Replacement in Itchingfield

Itchingfield gives its name to the parish that also takes in Barns Green, but the village itself is small and quiet, south west of Horsham. Older homes call for a lighter touch, which shapes every fixed price fuse box replacement we carry out in the village.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Itchingfield

Fuse box services for Itchingfield

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Period houses, careful hands

Changing a board without harming an old building

A small village like Itchingfield usually has its share of period houses, some timber framed, some brick, alongside later homes. In older buildings the consumer unit often sits somewhere awkward: under the stairs, on a beam, in a cupboard cut into a thick wall. Cables may pass through oak framing and lath and plaster that would not forgive careless drilling.

We plan the job around the fabric of the house. Wherever possible the new board goes exactly where the old one was, on the existing cable routes, so there is no need to chase plaster or cut timber. If it has to move, we agree the position and route with you first. Relocation alongside a new board adds £250.

  • Existing cable routes reused
  • No chasing into old plaster
  • Fixings agreed beforehand
  • Dust sheets and a tidy finish
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for ItchingfieldListed and period homes
Listed and period homes

When your house is on the list

If your Itchingfield home is listed, work that alters its historic fabric may need consent from Horsham District Council, and that can include new cable runs through old walls or beams. A straight swap of the consumer unit in the same spot normally leaves the fabric untouched, which is one reason we work hard to keep boards where they already are.

Responsibility for any consent rests with the owner, so if you are unsure, ask the council's conservation team before booking. From our side, we will describe exactly where the board and any new cables would go, giving you something specific to show them. Every board we fit has a metal enclosure, as the current regulations require.

  • Board kept in its existing place
  • New routes agreed in advance
  • Details you can share with the council
  • Metal enclosure as standard
Getting to you

Reaching the village

We usually come up the A24 past Southwater and cut across to the village, which sits between Christ's Hospital and Barns Green. Once your photos have given us a fixed quote, you pick a day that suits. Where a failed old board has cut your power, ring on any day and we will come out that day if we can.

Itchingfield at a glance

  • ParishItchingfield
  • CouncilHorsham District Council
  • PostcodeRH13
  • Nearest townHorsham, 4.6 km north east
  • Typical homesPeriod houses and later homes
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Itchingfield

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Itchingfield. Full breakdown on the pricing page.

Itchingfield questions

Asked in Itchingfield

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

It should not. In most cases the new consumer unit goes in the same spot as the old one and connects to the existing cables, so nothing new is cut into the frame. Where a fixing or cable has to go somewhere new, we show you first and choose routes that avoid structural timbers. Dust sheets go down before any work starts.

Yes. Moving the board as part of the replacement adds £250, and a standalone relocation is £395. People often want it out of a bedroom, away from a damp cellar or lifted off the floor. In an older house we look carefully at the cable route first, and if a move would mean cutting into old fabric, we will tell you.

Every installation carries our 6 year workmanship guarantee, and we hold £5m public liability insurance. A Part P registered installer from our own team fits the board, tests it to BS 7671 and notifies Building Control. Within 48 hours, the Electrical Installation Certificate lands in your email.

Ready when you are

Book your Itchingfield fuse box replacement

Living in one of Itchingfield's older homes? We give a fixed, careful quote once 0333 360 8691 receives two pictures: one of the board and one of where it sits.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.