Farmland village east of Chichester

Fuse Box Replacement in Oving

Oving sits just south of the A27 among the flat farmland east of Chichester, a small village about two and a half miles from the city. Every village house, farmhouse and converted farm building needs a sound consumer unit, and Part P registered fitters from our own team replace them at fixed prices.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Oving

Fuse box services for Oving

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Oving's properties

Village houses, farmhouses and conversions

Oving itself is a modest cluster of houses and cottages, and much of the land around it is farmed, with farmhouses and farm buildings along the lanes. Older cottages and farmhouses have often been rewired piecemeal over the decades, while agricultural buildings converted to homes were wired from scratch when they changed use. So the age and quality of what sits behind the board can vary a great deal.

Each board change is priced on what the property really needs: £425 for a cottage needing a dual RCD board of 6 ways, rising to £795 for an RCBO board of 14 to 16 ways in a larger farmhouse with several outbuilding supplies.

  • Cottages and farmhouses
  • Converted barns
  • Boards sized to the property
  • Fixed prices quoted up front
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for OvingOutbuildings on one supply
Outbuildings on one supply

Feeding barns, stables and workshops properly

Rural properties around Oving often take power out to a barn, stable, garage or workshop. Sometimes that supply was installed properly, with a dedicated circuit and suitable cable. Sometimes it began as an extension lead that became permanent, or a cable clipped along a fence. A new consumer unit is the right moment to find out which you have and sort it out.

We give each outbuilding supply its own protected way on the new board and, where a building needs several circuits, fit a small sub board inside it. If the outbuilding has its own earth electrode, we test that as well and record the result.

  • Dedicated outbuilding circuits
  • Sub boards in barns and workshops
  • Earth electrodes tested
  • Makeshift supplies removed
Getting to you

Coming out to Oving

Oving is about 25 miles west of Brighton & Hove, and the A27 brings us almost to the village, which makes it one of the quicker trips we make into Chichester district. Once your photos have given us a fixed price, we book a day that works around the farm or the household. Should a board fail, give us a call and we will look to come out that same day.

Oving at a glance

  • ParishOving
  • CouncilChichester District Council
  • PostcodePO20
  • Chichester4.1 km to the west
  • Typical propertiesCottages, farmhouses, conversions
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Oving

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Oving. Full breakdown on the pricing page.

Oving questions

Asked in Oving

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Yes. We allow a dedicated, correctly protected way for each outbuilding and check the cable that runs out to it. If the building needs lighting and sockets on separate circuits, we fit a small sub board there. Let us know what you use out there, from a freezer to power tools, so everything is sized properly.

It can. A buyer's survey will often pick out an old fuse box, and that can unsettle a sale. A new board backed by an Electrical Installation Certificate and Building Regulations compliance shows the work was done properly. Adding an EICR for £99 at the same visit gives buyers a full picture of the installation.

Some rural properties have more than one meter, for example a barn or a holiday cottage with its own supply. Each supply needs its own consumer unit, and we price them separately. Both can be replaced in one visit, and we test each installation independently so the certificates stay clear.

Ready when you are

Book your Oving fuse box replacement

Farmhouse, cottage or converted barn in Oving? A fixed price is only a text away: send pictures of the board and any outbuilding supplies to 0333 360 8691.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.