
Fuse Box Replacement in Nutley
Travel north on the A22 from Maresfield and you reach Nutley, a village on the south western edge of Ashdown Forest, north of Uckfield, with its restored windmill nearby. Thinking of moving away from oil or LPG heating? We make sure the board and supply are ready first.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Nutley
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

Older cottages to later family houses
Nutley is a village of mixed ages, with older cottages, houses built through the twentieth century and some more recent additions. That mix can mean boards of very different eras within a short walk: rewirable fuses in one home, a split-load board with two shared RCDs in the next, and a modern unit somewhere else.
Before quoting we ask what heats the house and what you plan to add, because the right board for a cottage with an electric shower differs from one for a family home expecting a heat pump. Expect most changes to take between four and six hours, with every circuit tested, not only the new ones.
- Older village cottages
- Post war and later houses
- Split-load boards replaced
- Heating loads considered first

Supply and board ready for a heat pump
Homes on and around Ashdown Forest are often some distance from a gas main, so oil, LPG and electric heating are common. As older boilers reach the end of their lives, many owners are looking at air source heat pumps. A heat pump adds a large, long-running load, and the main fuse, meter tails and consumer unit all need to cope.
We check the rating of your main fuse and the size of your meter tails, then fit a board with dedicated ways for the heat pump and its hot water cylinder. If the supply needs upgrading, we tell you exactly what to request from UK Power Networks, so the heat pump installer is not held up.
- Cut-out fuse rating read
- Meter tails assessed and upgraded
- Ways for heat pump and cylinder
- Upgrade requests explained
Up the A22 to Nutley
Nutley sits on the edge of Ashdown Forest. We travel via Lewes and the A26 to Uckfield, then follow the A22 north past Maresfield and into the village. A fixed quote comes back in reply to your board photos, with the dates we have free. Urgent faults can be phoned through on any day, and we will try our hardest to arrive that day.
Nutley at a glance
- ParishMaresfield
- CouncilWealden District Council
- PostcodeTN22
- Nearest townUckfield, 7.3 km south
- Planning forHeat pumps and larger loads
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Nutley
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Nutley. Full breakdown on the pricing page.
Asked in Nutley
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691Start with the main fuse in the sealed carrier near your meter. Its rating, often 60, 80 or 100 amps, is usually marked on it. Send us a photo along with your board and we can judge whether the supply, tails and board will cope, or whether you should ask UK Power Networks for an upgrade.
Boilers fed from a fused spur off a socket circuit are a common find. It is not necessarily unsafe, but a boiler is better on a circuit you can identify and isolate easily. We check the arrangement during the board change and suggest the clearest option, agreeing any extra work with you first.
It depends on how many circuits you have now and what else you plan, but a heat pump and its cylinder often need two or more ways between them. In a typical family home, £695 buys a full RCBO board of 10 to 12 ways, which leaves room for those and an EV charger later. Bigger houses may be better served by 14 to 16 ways, at £795.
Also covering places near Nutley
Book your Nutley fuse box replacement
Your Nutley quote starts with two photos: the board, and the main fuse beside your meter. Once both have arrived at 0333 360 8691, we reply with a price that is fixed.
- Call, 8am to 8pm0333 360 8691
- CoverageNutley: TN22