
Fuse Box Replacement in Norton
Out on the flat farmland north of Felpham, the hamlet of Norton belongs to Aldingbourne parish. Whether your board sits in a cottage hall, a farmhouse lobby or a garage across the yard, we replace it at a fixed price, test the whole property and include Type 2 surge protection.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Norton
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

Older rural homes, mixed electrics
Homes in a hamlet like Norton tend to be a mix of older cottages, farmhouses and houses added over the twentieth century, each wired and rewired at different times. That often leaves a fuse box that has been patched rather than replaced: a few modern breakers beside old rewireable fuses, or a separate switch fuse added for a cooker or shower. We look at the whole picture before quoting.
A new consumer unit brings all of that into one board, with RCD protection on every circuit and Type 2 surge protection built in. Six ways with dual RCD protection cost from £425, and if you want each circuit to trip on its own, a full RCBO board with 8 ways starts at £625.
- Cottages and farmhouses
- Patched boards brought together
- Dual RCD from £425
- Whole property tested

Power out across the yard
Rural plots around Aldingbourne can have more than one building on the same supply: a workshop, stables, a garden office or an annexe for family. Each of those should be fed by a properly sized and protected sub-main from the house board. When we replace your consumer unit, we test every outbuilding circuit too, including the cable that runs out to it underground or overhead.
A sub-main that was laid decades ago, perhaps in the wrong cable or too shallow, can trip a new board or fail its tests. If we find that, we tell you before any work starts and explain the options. Many outbuildings are better served by a small board of their own, which we can quote alongside the house.
- Workshops and garden offices
- Sub-mains tested end to end
- Annexes on the same supply
- Problems flagged before work starts
How we get to Norton
Norton lies west of our Brighton and Hove base, reached along the A27 and then south from Fontwell on the A29. You pay nothing extra for the distance. Phone on any day of the week; a board that has failed or keeps tripping gets our best effort at a visit that same day.
Norton (Aldingbourne) at a glance
- ParishAldingbourne
- CouncilArun District Council
- PostcodePO20
- Nearest townFelpham, 6.9 km south
- Supply we expectRural, often with outbuildings
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Norton
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Norton. Full breakdown on the pricing page.
Asked in Norton
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691Usually, yes, through its own circuit from the consumer unit, sized for the heating, lighting and sockets out there. The cable has to be the right type for burial or for its route and properly protected at both ends. If you are planning one, we can leave a spare way ready when we fit your new board.
In most cases. We test the cable feeding the garage and the board inside it. If the cable is sound, a new garage board can be fitted on the same visit as the house consumer unit, and we will price both before we start. If the cable is not up to the job, we explain what is needed and why.
No. Replacing a consumer unit is notifiable work under Part P, but because we are Part P registered we notify Building Control for you. Your Electrical Installation Certificate is emailed to you inside 48 hours, with the Building Regulations compliance certificate arriving later by post.
Also covering places near Norton
Book your Norton fuse box replacement
Pictures of the board and any switchgear in your outbuildings are what we need, and once they arrive at 0333 360 8691 we can give your Norton home a fixed price.
- Call, 8am to 8pm0333 360 8691
- CoverageNorton (Aldingbourne): PO20