
Fuse Box Replacement in Newick
Newick sits on the A272 west of Uckfield and counts among the larger villages on the road between there and Haywards Heath. Beyond the older houses near the green, much of the village is later twentieth century housing, where original consumer units are now reaching the end of their useful life.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Newick
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

From the green to the newer roads
Newick's housing runs from older cottages and houses around the green to estates of family homes added through the later twentieth century. Homes built from the 1960s to the 1980s were usually wired with a fuse box or an early consumer unit and no RCD protection, and many have since gained a plastic unit with one RCD covering only some of the circuits.
Replacing it with a metal board brings every circuit under RCD protection and adds Type 2 surge protection as standard. Ten ways on a dual RCD layout, from £495, or twelve on a high integrity board, from £575, usually give a family home with a busy kitchen enough room, and the whole house is tested before we leave.
- Pre-RCD boards replaced
- Single RCD units upgraded
- 10 and 12 way options
- Whole house tested

Leaving room on the board for an EV charger
Plenty of houses in a village like Newick have off road parking, which makes a home charger a realistic next step for many owners. A 7 kW charger draws around 32 amps for hours at a time, so it needs its own circuit and protection, and the earthing arrangement has to be suitable. Planning for it when the board is changed saves disturbing a brand new unit later.
Tell us if an electric car is on the way and we will leave a spare way and record your main fuse size and earthing type, both of which the charger installer will ask about. If you also run an electric shower and cooker, we will say honestly whether the supply looks comfortable with everything on at once.
- Spare way kept for a charger
- Main fuse size recorded
- Earthing type noted
- Shower and cooker loads considered
Newick from Brighton & Hove
Newick can be reached by way of Lewes and the A275, or by the A23 and A272. Whichever road we take, the journey is not added to your bill. One look at the consumer unit in a photo is all it takes for us to settle a price and propose dates. Sudden faults get a same day response wherever we can manage it, so just call.
Newick at a glance
- ParishNewick
- CouncilLewes District Council
- PostcodeBN8
- Nearest townUckfield, 5.4 km to the east
- Typical homesLater twentieth century houses
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Newick
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Newick. Full breakdown on the pricing page.
Asked in Newick
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691Sometimes. If your current unit is a modern metal board with a spare way and suitable protection, a charger can often connect to it. Older plastic units, or boards with no space left, usually cannot take one safely. One photo tells us which side of that line your board falls on, before you spend anything.
It is usually better to change the board first or as part of the project, so the new circuits for the loft go straight onto it. If the builder's electrician is wiring the conversion, we can agree spare ways with them in advance. Changing the board afterwards means disturbing brand new work and testing it all again.
Not normally. Testing of the whole installation happens on the day, your Electrical Installation Certificate comes through by email within two days, and Building Control is informed under Part P. We only return if testing turns up a fault that needs a separate repair, and we agree that with you first.
Also covering places near Newick
Book your Newick fuse box replacement
Thinking about a new board, or an electric car on the drive? Point your phone at the Newick consumer unit, and the pictures you send to 0333 360 8691 will get a fixed price in reply.
- Call, 8am to 8pm0333 360 8691
- CoverageNewick: BN8