
Fuse Box Replacement in Fletching Common
Despite its name, the hamlet of Fletching Common lies in Newick parish, west of Uckfield, and answers to Lewes District Council. Rural homes are often supplied by overhead lines and rely on their own earth rod, so we check that earthing carefully whenever we replace a fuse box here.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Fletching Common
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

Rural houses and the boards they came with
Homes here are one-off properties, put up and altered at different times, in this small settlement among the fields. In houses like these the fuse box is often the oldest part of the installation, sometimes still with rewireable fuses, sometimes a consumer unit fitted before RCD protection became usual on every circuit.
A metal consumer unit with RCD protection throughout is the heart of the job, from £425 for a dual RCD board. If a garden office, stable or workshop takes its power from the house, we check how that supply leaves the board and whether its earthing suits an outbuilding.
- Rewireable fuses retired
- RCD protection on every circuit
- Outbuilding supplies checked
- Metal board as standard

TT earthing: your home's own connection to earth
In towns, most homes take their earth from the network operator's cable. Plenty of rural properties use a TT system instead, taking their earth from a metal rod sunk into the soil close to the house. That rod has to make good contact with the soil, and its resistance can change as it corrodes or as the ground dries out in summer.
On a TT supply, RCDs are what disconnect the power quickly in an earth fault, so full RCD cover matters even more. Testing covers the earth electrode's resistance and checks that the rod and clamp are sound and protected; if a new or extra rod is needed, we say so plainly.
- Earth electrode resistance measured
- Rod and clamp inspected
- Full RCD cover on TT supplies
- Clear advice if a rod is needed
Travelling to Fletching Common
We reach Fletching Common through Lewes and up the A275 towards Newick, with no extra charge for the journey. For a fixed price, photograph the board, then the meter, and if you can find it, the earth rod clamp outside. An urgent fault is worth a call straight away, since we try to reach such jobs the same day.
Fletching Common at a glance
- ParishNewick
- CouncilLewes District Council
- PostcodeBN8
- Nearest townUckfield, 6.4 km to the east
- Earthing to check forTT with an earth rod
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Fletching Common
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Fletching Common. Full breakdown on the pricing page.
Asked in Fletching Common
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691Usually outside, close to where the supply enters the house, often under a small inspection cover or in a flower bed. A green and yellow cable runs from it to the main earthing terminal near the meter. If you cannot find it, do not worry: tracking it down and testing it on the day is included in the work.
It depends how high. With RCD protection, a TT system can be safe with a fairly high reading, but very high or unstable readings need attention. We retest the rod during the board change, compare the result with what the regulations and the RCDs need, and tell you whether it is fine, needs a second rod alongside or needs replacing.
Sometimes. Where the house has a PME supply, an outbuilding is often better given its own earth rod, while on a TT system the house rod may serve both. We look at how the building is fed and earthed during testing and explain the safest arrangement for your setup, rather than leaving it as it was by default.
Also covering places near Fletching Common
Book your Fletching Common fuse box replacement
Is your Fletching Common home due a new fuse box? Shots of the board and of the meter, sent through to 0333 360 8691, bring a fixed price that already covers the earthing checks.
- Call, 8am to 8pm0333 360 8691
- CoverageFletching Common: BN8