
Fuse Box Replacement in Wellbrook
The parish of Mayfield and Five Ashes takes in Wellbrook, a small village north of Heathfield and not far from Mayfield itself. Worn out fuse boxes are replaced here at a fixed price, by a team used to homes where the heating runs on electricity rather than gas.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Wellbrook
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

What we tend to find in Wellbrook homes
In a small Wealden village like Wellbrook, houses built decades apart often sit side by side, and the electrics vary just as much. One home may still have a unit with no RCD protection at all; the next may have a newer board that has been added to so many times that the labels no longer match the circuits behind them.
We start by asking what does and does not work, then test each circuit before and after the change. Smaller cottages suit a £425 dual RCD board of six ways, whereas £625 buys an 8 way full RCBO board, giving every circuit protection of its own.
- Labels matched to circuits
- Tested before and after
- Board sized to the house
- Type 2 surge device fitted

Storage heaters, Economy 7 and the second board
Country homes without mains gas sometimes heat with night storage heaters and an immersion on a cheaper overnight rate. These houses usually have a two rate meter, or an older pair of meters, with a separate small board or switch for the off peak circuits that come on at night. Over the years these set ups get muddled, with day circuits on the night supply or the other way round.
When we replace the main board we trace which circuits run on which rate, then keep the off peak heating on its own protected supply, or bring everything into one tidy layout where your meter allows it. Every circuit is labelled, so you can see at a glance what charges overnight.
- Off peak circuits traced
- Storage heaters protected
- Immersion on the right rate
- Day and night clearly labelled
Getting to Wellbrook and booking in
To get to Wellbrook we head up through Heathfield and on towards Mayfield. Ahead of the visit, send us pictures by text of the meter, the board and any separate switch for the night heating, so we can fix the price. Whatever the day, a power failure that will not come back on is worth a phone call, since we aim to get there that same day.
Wellbrook at a glance
- ParishMayfield and Five Ashes
- CouncilWealden District Council
- PostcodeTN20
- Nearest townHeathfield, 5.4 km south
- Off gas heating we seeStorage heaters, oil, LPG
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Wellbrook
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Wellbrook. Full breakdown on the pricing page.
Asked in Wellbrook
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691It mainly adds a tracing step. A two rate supply, whether one meter with two readings or two separate meters, usually feeds the overnight heating through its own switch or small board. We work out which circuits sit on each rate before disconnecting anything, then reconnect them so the storage heaters and immersion still come on when they should.
A board change usually lasts 4 to 6 hours, with the supply switched off for most of it while the old board comes out, the new one goes in and every circuit is tested. We will tell you roughly when to expect it back. If you heat with storage heaters, they will have charged overnight, so the house should hold some warmth while we work.
It is a good idea. Each storage heater normally has its own circuit, but on older off peak boards they often share one RCD, or have none at all. On a full RCBO board every heater circuit gets its own protection, so a failing element trips only that heater. For £695 you can have an RCBO board with 10 to 12 ways.
Also covering places near Wellbrook
Book your Wellbrook fuse box replacement
Got an old fuse box and night storage heaters in your Wellbrook home? Pictures of the board, the meters and any heating switches, sent by text on 0333 360 8691, let us fix your price.
- Call, 8am to 8pm0333 360 8691
- CoverageWellbrook: TN20