Small hamlet in Shipley parish

Fuse Box Replacement in The Bar

Homes are few and far between at The Bar, a hamlet set in Low Weald farmland in Shipley parish, south of Horsham. Our fixed price board changes suit them, and we are used to rural houses that heat with electricity rather than gas.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in The Bar

Fuse box services for The Bar

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Rural homes, one by one

Houses at The Bar and their wiring

Small rural settlements around Shipley tend to have a mix of older cottages, farm related houses and individually built homes, often with the electrics altered piece by piece over many years.

That patchwork often shows at the meter position: two or three separate units, a switch fuse for the cooker, another for the heaters. A new board can bring these together neatly, with dual RCD protection from £425 and surge protection fitted as standard.

  • Several old units combined
  • Separate switch fuses tidied
  • Dual RCD from £425
  • Type 2 surge protection fitted
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for The BarHeating with electricity
Heating with electricity

Night storage heaters, Economy 7 and your board

Plenty of rural homes away from the gas network rely on storage heaters charged overnight on a cheaper rate. These are often wired through a second, off peak board or a group of switch fuses beside the meter, switched by the meter or a time clock. When the main fuse box is replaced, those circuits deserve the same attention.

We check how your off peak supply is arranged before quoting. Sometimes the heater circuits move onto the new board, sometimes they stay on a separate unit that we test and report on. Either way, the heaters, immersion and timers are tested after the change.

  • Off peak circuits identified
  • Heaters tested after the change
  • Immersion and timers checked
  • Second board inspected too
Getting to you

Getting out to The Bar

From Brighton & Hove we come up through the countryside south of Horsham, and there is never a travel charge within Sussex. Along with your photos, please include the postcode and a short note about the entrance. For faults, we aim to see you on the day you call.

The Bar at a glance

  • ParishShipley
  • CouncilHorsham District Council
  • PostcodeRH13
  • Nearest townHorsham, 7.1 km to the north
  • Often foundStorage heaters on off peak
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in The Bar

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to The Bar. Full breakdown on the pricing page.

The Bar questions

Asked in The Bar

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Not always. The off peak unit feeds the storage heaters and sometimes the immersion, and is switched by the meter or a timer. If it is old or has no RCD protection, it makes sense to bring those circuits onto the new main board or replace that unit as well. Your photos usually show us which.

No. The meter belongs to your energy supplier and we do not alter it. We isolate the supply, fit the new board and connect it back to the existing meter arrangement. Your day and night rates carry on as before, and the heaters charge overnight as usual.

They can be. Heaters sharing an RCD with other circuits can all go off together if one develops a fault, leaving rooms cold by morning. A full RCBO board, which starts at £625, gives every heater circuit its own protection, so a fault on one leaves the rest still charging.

Ready when you are

Book your The Bar fuse box replacement

One price can cover the whole arrangement at your home at The Bar, provided the photos you text on 0333 360 8691 show every fuse box and switch.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.