Just north of Fletching village

Fuse Box Replacement in Splaynes Green

Just north of Fletching village, and north west of Uckfield, lies the hamlet of Splaynes Green. If your home relies on a sewage treatment plant or a pump, we plan the new consumer unit around the equipment that has to keep running.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Splaynes Green

Fuse box services for Splaynes Green

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
A small Fletching hamlet

Small hamlet, boards of every vintage

Splaynes Green is a small group of homes among Wealden fields and woodland, close to Fletching yet clearly apart from it. In a hamlet this size each house has been altered on its own timetable, so an original fuse box with rewirable fuses is as likely as a plastic board from decades ago that offers no RCD protection at all.

Whatever is on the wall now, the job starts with tracing each circuit and noting what it feeds, from the kitchen to the garage. The swap itself usually fills four to six hours. Dual RCD boards cost from £425, and whichever board you choose, Type 2 surge protection plus a full test of the property are in the price.

  • Rewirable fuse carriers retired
  • Boards without RCDs upgraded
  • Each circuit traced and labelled
  • Surge protection in the price
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for Splaynes GreenPrivate drainage in the garden
Private drainage in the garden

Pumps and treatment plants that must stay on

Homes in rural hamlets are not always connected to mains drainage, and where they are not, a sewage treatment plant or pumping station in the garden usually runs from the house supply. Its blower or pump is meant to run around the clock. On an old board it may share a fuse with other circuits, so an unrelated fault can quietly stop it.

When we fit the new board we give the plant its own protected way, test the cable out to it and check that any alarm or outdoor isolator is properly connected. Should it trip, the label tells you at once which circuit has gone, while every other circuit in the home keeps working.

  • Treatment plant on its own way
  • Outdoor cable to the plant tested
  • Alarm and isolator checked
  • Faults kept off other circuits
Getting to you

Splaynes Green via Lewes and Chailey

From Brighton & Hove we take the A27 to Lewes, then the A275 north through Offham and Chailey before following the lanes east towards Fletching. Send pictures of the board by text, and once the fixed quote is with you, choose a date that suits. Urgent faults are different: ring us, and a visit that same day is the goal whenever it can be managed.

Splaynes Green at a glance

  • ParishFletching
  • CouncilWealden District Council
  • PostcodeTN22
  • Nearest townUckfield, 5.4 km south east
  • Worth mentioningTreatment plants or pumps
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Splaynes Green

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Splaynes Green. Full breakdown on the pricing page.

Splaynes Green questions

Asked in Splaynes Green

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Many plants have an alarm or indicator that warns when the blower or pump stops, though some can only alarm while they still have power. Once the plant has its own labelled way in the new board, a glance tells you whether that circuit has tripped. If it trips repeatedly, testing shows whether the plant, its cable or a damp outdoor connection is at fault.

Yes. The old fuse carrier and the wooden backboard come out, and a steel consumer unit goes in on a sound, non-combustible fixing. Where the meter tails are tired or undersized, we point that out and renew them while we are there. Every circuit is tested before the power goes back on.

Usually not. Most board changes need nothing from the network operator, and we isolate the installation safely on the day. If we notice something on their side, such as a damaged cut-out or a main fuse too small for your plans, we explain what to ask UK Power Networks for and why.

Ready when you are

Book your Splaynes Green fuse box replacement

Running a treatment plant or pump? Say so in your message to 0333 360 8691, along with pictures of the fuse box and meter, and your Splaynes Green home gets a price that will not change.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.