
Fuse Box Replacement in Maynard's Green
Horam parish takes in Maynard's Green, a village lying south of Heathfield. If your board is old, or a builder has told you it must be upgraded before new work goes in, we fit replacements at a fixed price.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Maynard's Green
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

What sits under the stairs in Maynard's Green
Houses here span several generations, from older cottages to post-war and later family homes, and the consumer unit is rarely as new as the kitchen. In homes of these ages the usual suspects are plastic split load boards from the 1980s or 1990s, where a single RCD guards half the circuits, and the odd surviving fuse box with rewireable fuse wire. Both fall short of today's wiring regulations.
A new board places each circuit behind RCD or RCBO protection in a metal enclosure, adding Type 2 surge protection too. Expect £495 for dual RCD protection across 10 ways, or from £625 for full RCBO. We size the board with spare ways, so whoever wires the new kitchen or extension has somewhere to connect.
- Split load boards replaced
- Spare ways for new circuits
- Metal enclosure, surge protected
- Whole house tested

Kitchen refits and extensions start at the board
Adding circuits for an induction hob, an electric oven or a new extension is notifiable work under Part P, and the electrician doing it has to confirm the existing board and earthing can support it. An old fuse box, or a board with no free ways and no RCD on the relevant circuits, usually means the upgrade has to come first.
Doing the board early saves a second shutdown later. Tell us what the kitchen or extension will need when you send photos, and we will plan ways and ratings around it. The Electrical Installation Certificate reaches you within 48 hours, ready for your builder and for Building Control.
- Induction hob loads allowed for
- Ways reserved for the extension
- Certificate for your builder
- Building Control notified
Between Horam and Heathfield
Coming out from Brighton & Hove to Maynard's Green, we arrive either from the Horam side or down from Heathfield, whichever suits the day's other jobs. You pay nothing for our travel. Pictures showing the board and meter get you a fixed price, plus a date in the diary. When the power fails and will not reset, we work towards getting an installer there on the day.
Maynard's Green at a glance
- ParishHoram
- CouncilWealden District Council
- PostcodeTN21
- Nearest townHeathfield, 2.5 km north
- Typical homesOlder cottages and post-war family houses
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Maynard's Green
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Maynard's Green. Full breakdown on the pricing page.
Asked in Maynard's Green
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691It is common. Any electrician adding a circuit must first confirm the board can protect it properly, which an old fuse box, or a board lacking RCD protection, usually cannot do. Replacing it first means the new kitchen circuits connect straight into a modern, tested board, and the paperwork covers the work for Building Control.
It depends on what the extension adds: a couple of lighting and socket circuits, perhaps an electric shower, underfloor heating or a car charger later on. Family houses with plans often suit a board of 10 to 12 ways, which costs £695 in full RCBO form. We size it from your photos and drawings rather than guessing.
Usually, yes. Cooking appliances normally run on their own radial circuit, and a modern board is rated well above typical household demand. What we check is the cable to the cooker point, the rating of its breaker and the size of the incoming supply fuse, so the new appliances are properly protected without nuisance tripping when everything is on.
Also covering places near Maynard's Green
Book your Maynard's Green fuse box replacement
Kitchen or extension plans are worth including with your board and meter pictures, which can go to 0333 360 8691; from those we price the Maynard's Green upgrade.
- Call, 8am to 8pm0333 360 8691
- CoverageMaynard's Green: TN21