
Fuse Box Replacement in Mark Cross
Mark Cross is a village in Rotherfield parish, sitting east of Crowborough on the A267 between Tunbridge Wells and Heathfield. Our fixed price for replacing a worn fuse box here with a modern consumer unit takes in Type 2 surge protection, a full test of the house and a certificate within 48 hours.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Mark Cross
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

Older village houses beside newer neighbours
Like many Wealden villages, Mark Cross has grown in stages, so the houses along its roads were not all wired at the same time. That tends to show at the fuse box: some homes still have a wooden-backed board with rewireable fuses, others a 1990s unit where a single RCD guards half the circuits, and a few have had boxes added as the house grew.
In most cases one picture showing both the board and the meter lets us put a price on the work. Many houses are well served by a dual RCD unit at £425. Where you would rather a single fault switched off only its own circuit, full RCBO protection starts at £625.
- Rewireable fuse boards replaced
- Single RCD units upgraded
- Main earth and bonding checked
- Circuits labelled in plain English

Planning an extension or a loft room?
Village homes here are often extended rather than replaced: a kitchen pushed out at the back, a loft turned into a bedroom, a garage converted into a study. Each of those adds circuits, and an older fuse box rarely has the spare ways or the RCD protection that new work needs before it can be signed off.
If building work is on the horizon, it is worth changing the board first or at the same time. The new consumer unit is sized with spare ways for the planned work, the Part P notification to Building Control is dealt with, and your builder gets a clear certificate to work from.
- Spare ways for future circuits
- Part P notification handled
- Certificate ready for your builder
- Board sized for the finished house
Getting out to Mark Cross
The route out runs from Brighton & Hove to Lewes, up the A26 through Uckfield to Crowborough, and then along the Rotherfield road to Mark Cross. You are not charged a penny for the journey. Photos let us settle the price before you choose a date, and if the power has gone off altogether, a phone call gets us working on reaching you the same day.
Mark Cross at a glance
- ParishRotherfield
- CouncilWealden District Council
- PostcodeTN6
- Nearest townCrowborough, 6.7 km to the west
- Typical homesOlder cottages and later village houses
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Mark Cross
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Mark Cross. Full breakdown on the pricing page.
Asked in Mark Cross
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691Ideally before, or as part of the same job. An extension's new circuits must have RCD protection and a free way to connect to, two things an older fuse box seldom offers. Fitting the consumer unit first means your electrician or builder can connect straight into it, and the whole installation ends up properly certified.
Usually, yes. Most replacements go exactly where the old board was, reusing the existing circuits once they pass testing. If the current spot is awkward, for example high in a cupboard or in a damp outbuilding, we can move it when we fit the new board for an extra £250, priced up front.
Every circuit in the house is tested, not just the board: insulation resistance, earth continuity, polarity, earth fault loop impedance and the trip time of each RCD or RCBO. The results go on your Electrical Installation Certificate, which we email within 48 hours, and the work is notified to Building Control.
Also covering places near Mark Cross
Book your Mark Cross fuse box replacement
Planning work on your Mark Cross home? A text to 0333 360 8691 with a picture of the fuse box and a note of what you are adding is enough for a fixed price.
- Call, 8am to 8pm0333 360 8691
- CoverageMark Cross: TN6