Rural hamlet in Horsham District

Fuse Box Replacement in Kent Street

Countryside surrounds Kent Street, a little hamlet in Shermanbury parish, Horsham District, lying to the west of Burgess Hill. Old fuse boxes in local homes are changed for a price fixed in advance, with each replacement board sized to leave room for any heating or charging you add in years to come.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Kent Street

Fuse box services for Kent Street

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Detached homes in open country

Rural houses wired for oil boilers and immersion heaters

Homes around Kent Street are typical of rural Horsham District: detached houses and cottages with gardens and outbuildings, and quite often heating that does not come from mains gas. That shapes the electrics, with immersion heaters, oil boiler controls and electric showers all taking their share of the circuits on the board.

Older boards in homes like these often have every way filled and no RCD protection on circuits such as the immersion or the boiler supply. In their place goes a full RCBO board with spare ways left free, costing £695 in the 10 to 12 way size, a figure that already covers Type 2 surge protection.

  • Immersion heater circuit protected
  • Boiler controls on their own way
  • Electric shower cable checked
  • Spare ways left for later
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for Kent StreetOff the gas grid
Off the gas grid

Getting the board ready before a heat pump arrives

Where a home relies on oil or LPG, an air source heat pump is often the replacement being weighed up, and it brings a large new electrical load. The heat pump needs its own dedicated circuit, and the installer will usually want to see a modern board with space for it before committing to a date.

Changing the board first gives that circuit a proper home. We also note your main fuse rating and earthing, since the heat pump installer may need to apply to UK Power Networks to confirm the supply can take the extra load. Both details go on your certificate.

  • Dedicated way for a heat pump
  • Main fuse rating recorded
  • Earthing details on the certificate
  • Room left for future circuits
Getting to you

Reaching Kent Street

Depending on traffic, we come up the A23 and west across the lanes, or north through Henfield. There is never a travel charge. Pricing is fixed from your photos, so include the board and meter, plus any supplies running out to outbuildings. No power at all? Ring us, and getting to you that day is the aim.

Kent Street (Shermanbury) at a glance

  • ParishShermanbury
  • CouncilHorsham District Council
  • PostcodeRH13
  • Nearest townBurgess Hill, 8.5 km east
  • Heating we often seeOil, LPG or electric
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Kent Street

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Kent Street. Full breakdown on the pricing page.

Kent Street questions

Asked in Kent Street

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Not always. Many homes have a 60, 80 or 100 amp main fuse, and a heat pump can often be accommodated within that, depending on what else you run at the same time. The main fuse belongs to UK Power Networks, so any upgrade is arranged through them. We record your current rating so your installer can work it out.

Immersion heaters draw a steady, heavy current for hours at a time, which exposes weak connections and tired fuse carriers, and scorching around that part of an old board is a common sign. On the new board the immersion gets its own correctly rated breaker, and we check the cable and the switch beside the cylinder as well.

Yes, if we plan for it. A solar inverter needs its own way, and some systems with batteries need particular types of protection. If solar is likely in the next few years, tell us when you send photos, and we will leave a suitable spare way so your installer can connect without changing the board again.

Ready when you are

Book your Kent Street fuse box replacement

Thinking about a heat pump? Send 0333 360 8691 a picture of your board, plus one of the meter, and we can price a Kent Street board with space set aside for one.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.