A hamlet in Wadhurst parish

Fuse Box Replacement in Turners Green

Among the hamlets of Wadhurst parish, east of Crowborough, is Turners Green. When we swap an old fuse box for a modern consumer unit here, the price is fixed, and any second meter or off-peak board gets sorted out on the same visit.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Turners Green

Fuse box services for Turners Green

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Cottages close to the village

What we expect to find in Turners Green

As a hamlet on the edge of a larger village, Turners Green is likely to have a mixture of older cottages and twentieth century houses rather than one uniform style. In homes of that sort the original fuse box was often never fully replaced. Instead, a newer unit was fitted beside it, leaving two sets of protection that nobody quite understands.

We trace every circuit back to its source, combine what can safely be combined and label the result clearly. Expect to be without power for most of the job, typically four to six hours, after which you have a single board and one clear schedule.

  • Old and new boards combined
  • Every circuit traced and named
  • Power back on the same day
  • Single schedule left on the door
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for Turners GreenOff-peak meters and storage heaters
Off-peak meters and storage heaters

Two meters, two boards, one tidy answer

Some homes around Wadhurst were heated with night storage heaters, which means a dual rate meter and often a separate off-peak board or timeswitch beside the main fuse box. Years later the heaters may have gone, but the extra equipment is still on the wall, sometimes feeding a water heater and nothing else.

When we replace the board we look at how the off-peak side is used now. If it still serves heaters or an immersion, it stays and is properly protected. If it serves nothing, we can tidy it away, and we can tell you what to ask your supplier about the meter.

  • Off-peak circuits identified
  • Storage heater supplies protected
  • Redundant gear removed where safe
  • Immersion heater circuits tested
Getting to you

Coming to Turners Green

The quickest way is usually north on the A26 to Crowborough, then across through Rotherfield and Mark Cross into Wadhurst parish. There is no charge for travel. Book a date from a photo quote, or call us on any day of the week for help with a total loss of power.

Turners Green (Wadhurst) at a glance

  • ParishWadhurst
  • CouncilWealden District Council
  • PostcodeTN5
  • Nearest townCrowborough, 12 km west
  • Worth checkingAny second meter or off-peak board
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Turners Green

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Turners Green. Full breakdown on the pricing page.

Turners Green questions

Asked in Turners Green

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Yes. Storage heaters on a dual rate supply are wired to the off-peak side, and we keep that arrangement working, with each heater circuit properly protected. If you are thinking of replacing the heaters, tell us when you send photos, as it may change how many ways the new board needs.

Most likely a timeswitch or teleswitch that controls when off-peak electricity reaches certain circuits, usually heaters or a hot water cylinder. A photo helps us identify it. Whether it stays depends on your tariff and what it still controls, and we never remove anything that belongs to your energy supplier.

In many homes the answer is a single new consumer unit with enough ways for everything, priced from £425 for dual RCD or £625 for full RCBO. Where an off-peak board needs to stay separate, we say so from your photos and fix the price before you book, so there are no surprises on the day.

Ready when you are

Book your Turners Green fuse box replacement

Photograph the fuse box, the meter and anything mounted beside them, then text it all to 0333 360 8691. From those pictures we work out one fixed price for the house.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.