Towards Cousley Wood from Wadhurst

Fuse Box Replacement in Pell Green

Head north east out of Wadhurst village, on the way towards Cousley Wood, and you reach Pell Green, a hamlet in Wadhurst parish to the east of Crowborough. Old fuse boxes here are swapped for consumer units on a fixed price basis, and for homes gearing up for a heat pump we make sure the supply is right first.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Pell Green

Fuse box services for Pell Green

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Rural houses on the parish edge

Rural homes beyond the edge of the village

Pell Green lies beyond the main body of Wadhurst, where houses are spaced further apart and supplies are more likely to arrive on overhead lines. Out here we expect to see older boards that have been extended over the years, sometimes with garages or outbuildings run from the house, and earthing that depends on a rod in the ground rather than the supply cable.

That kind of earthing needs testing properly, as a rod that has corroded or been disturbed can leave RCDs as the only real protection. We measure it on every job and replace or add a rod where readings are poor, with the cost agreed in advance.

  • Earth rod resistance measured
  • Overhead supplies understood
  • Outbuilding circuits included
  • Extra costs agreed before work
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for Pell GreenOil, LPG and heat pumps
Oil, LPG and heat pumps

Swapping the oil tank for a heat pump

Rural homes beyond the reach of mains gas often heat with oil or LPG, and some owners are now weighing up an air source heat pump. A heat pump adds a large, long running load to the house, so the consumer unit needs a suitable way for it, and the supply itself has to cope alongside cooking, hot water and any car charger.

We can replace the board ahead of the installer, leaving a dedicated way for the heat pump and checking the main fuse rating at the cut-out. If an upgrade from UK Power Networks looks likely, we tell you early so it does not hold up the project.

  • Dedicated way for the heat pump
  • Main fuse rating checked
  • Upgrade needs flagged early
  • Ready before the installer arrives
Getting to you

Travelling out to Pell Green

From Brighton & Hove the road runs through Uckfield, Crowborough and Wadhurst, then out along the lanes north east of the village to Pell Green. None of that is added to your bill. Your photos give us what we need to fix the quote and book a date, and if everything has gone off, give us a ring.

Pell Green at a glance

  • ParishWadhurst
  • CouncilWealden District Council
  • PostcodeTN5
  • Nearest townCrowborough, 12.9 km west
  • Supply we expectOverhead, often with an earth rod
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Pell Green

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Pell Green. Full breakdown on the pricing page.

Pell Green questions

Asked in Pell Green

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Not always. It depends on the main fuse at the cut-out, the size of the heat pump and what else the house runs. We read the fuse rating and work out the likely demand when we change the board. If the numbers look tight, your heat pump installer can apply to UK Power Networks, and we will explain why.

We carry out an earth electrode resistance test, then check the earth fault loop on each circuit to confirm the RCDs will trip quickly enough. Readings go on your certificate. If the rod is missing, damaged or reading too high, we explain the options and price a replacement before going any further.

It can be laid out for both, with each on its own protected way. The bigger question is the total demand on your supply, which we assess on the day. Where both loads are planned, telling us up front means we can size the board once rather than coming back later.

Ready when you are

Book your Pell Green fuse box replacement

Thinking about a heat pump? Say so in your message to 0333 360 8691, along with pictures of the cut-out, the meter and the board, and your fixed price for Pell Green will reflect it.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.