Hamlet north west of Horsham

Fuse Box Replacement in Strood Green

A short way from Broadbridge Heath, north west of Horsham, Strood Green is a hamlet belonging to Slinfold parish. Our board changes come at fixed prices and take in the pumps and services that a rural home relies on.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Strood Green

Fuse box services for Strood Green

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Quiet country housing

A small settlement with rural wiring

Strood Green is a scattering of homes rather than a village with a centre, so there is no single type of house here. What rural properties like these tend to share is wiring that has been extended over many years, often to reach garages, sheds, stables and outside services that a town house would never need.

A new consumer unit brings all of that under modern protection. Dual RCD boards start at £425 for 6 ways and £495 for 10 ways, while full RCBO boards start at £625. Whichever you choose, it carries a Type 2 surge device, and your certificate is emailed to you inside 48 hours.

  • Extended wiring brought up to date
  • Outside circuits protected
  • Certificate within 48 hours
  • Surge protection fitted
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for Strood GreenPumps that must keep running
Pumps that must keep running

Treatment plants, water and drainage pumps

Homes away from mains drainage often have a sewage treatment plant, and some have a pumped drain or a private water pump. These need power around the clock. On an old board they may share a circuit or an RCD with outside sockets, so a fault in the garden can quietly stop a treatment plant for days before anyone notices.

If your home has any of these, mention it with your photos. We give each pump or plant its own RCBO, label it clearly and test it once the new board is in. If a trip does happen, it affects that one item, and it is easy to see which switch to check.

  • Treatment plant on its own RCBO
  • Pumps clearly labelled
  • Outside sockets kept separate
  • Tested before we leave
Getting to you

Out past Broadbridge Heath

We come up the A24 to Horsham, then out past Broadbridge Heath into the lanes of Slinfold parish. The distance adds nothing to your price. When you get in touch, include pictures of the meter and any pump controls as well as the board. Losing power is reason enough to phone us, and a visit that same day is what we work towards.

Strood Green at a glance

  • ParishSlinfold
  • CouncilHorsham District Council
  • PostcodeRH12
  • Nearest townHorsham, 4.2 km south east
  • Ask us aboutPumps and treatment plants
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Strood Green

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Strood Green. Full breakdown on the pricing page.

Strood Green questions

Asked in Strood Green

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Yes, and it is worth doing. When we change the board we can give the treatment plant a dedicated way with its own RCBO, so a fault in the garage no longer stops it. If the cable to the plant is shared further along its route, we will explain what separating it fully would involve.

The pump will be off while the board is changed, so fill a few containers and the kettle beforehand. A board change usually takes 4 to 6 hours. We reconnect the pump as soon as testing allows and check it runs properly before we leave. Tell us about it when you book so we can plan.

No. Travel costs nothing across Sussex, so a home here pays the same fixed price that one in Horsham or Brighton would. For that you get Type 2 surge protection, a test of the whole property, notification to Building Control and your certificate by email inside 48 hours.

Ready when you are

Book your Strood Green fuse box replacement

Photograph the board along with any pump or treatment plant controls and send the lot to 0333 360 8691. Your fixed Strood Green price will then take proper account of them.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.