
Fuse Box Replacement in Selmeston
Tucked just off the A27 between Firle and Berwick, the small village of Selmeston looks south to the rising Downs. Rural homes like these are often off mains gas, and moving the heating onto electricity puts new demands on the fuse box. We make sure your board is ready for it.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Selmeston
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

Storage heaters, two meters and two boards
Homes in small villages like Selmeston have often been heated with oil, solid fuel or electric storage heaters rather than mains gas. Storage heater homes commonly have an off-peak meter and a second small board or a row of switches for the heaters and immersion, wired in at different times. The result can be confusing, and hard to isolate safely in a hurry.
When we replace the main board we work out what feeds what, combine circuits where the metering allows, and label the rest clearly. Off-peak circuits that must stay on their own meter keep their own protection, tested to the same standard as everything else.
- Off-peak circuits identified
- Storage heater supplies tested
- Second boards tidied or combined
- Clear labels for both meters

Is your board ready for a heat pump?
Swapping an oil boiler for an air source heat pump is a common step for rural homes, and it changes what the electrics are asked to do. The heat pump needs a dedicated circuit, usually with an isolator by the outdoor unit, and the total demand of the house rises through the winter. An older board with no spare ways will hold the project up.
The new board has ways kept free for the heat pump and any backup immersion, and a full RCBO layout means a fault on the heating circuit trips that circuit alone, leaving everything else on. Priced at £695, the RCBO board with between 10 and 12 ways is ready for your heating installer to connect to.
- Dedicated way for the heat pump
- Backup immersion circuit kept
- RCBO layout limits nuisance trips
- Ready before the installer arrives
Selmeston is close to our base
Heading east on the A27, we pass Lewes and are soon in Selmeston, with Polegate further along the same road. Price first, date second: an image of the board lets us settle the cost, then you choose when we come. Our phones are staffed every day, and a complete loss of power gets priority, with a same day visit wherever we can manage it.
Selmeston at a glance
- ParishSelmeston
- CouncilWealden District Council
- PostcodeBN26
- Nearest town pagePolegate, 7.5 km east
- Heating to ask aboutOil, LPG or storage heaters
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Selmeston
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Selmeston. Full breakdown on the pricing page.
Asked in Selmeston
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691Yes. Tell us who is fitting the heat pump and roughly when, and we will time the board change so it is done first. We leave a clearly labelled spare way for the heat pump circuit, and you can pass our certificate to the installer so they can see the test results before connecting.
No. The board sits after the meter, so your tariff and metering stay exactly as they are. What changes is the protection on each circuit and how clearly it is labelled. If you are thinking of removing the storage heaters later, a few spare ways on the new board make that easier.
Arc fault detection devices spot the kind of sparking that comes from a loose connection or damaged cable, which ordinary RCDs cannot see. In an older cottage with timber in its structure, some owners feel the extra cover is worth having. Combined RCBO and AFDD boards are from £1,095 with 10 ways, or £1,295 with 14.
Also covering places near Selmeston
Book your Selmeston fuse box replacement
Planning a heat pump, or simply tired of an old fuse box in Selmeston? Either way, send a photo by text to 0333 360 8691; the price you get back is fixed.
- Call, 8am to 8pm0333 360 8691
- CoverageSelmeston: BN26