Village in Harting parish, near Rogate

Fuse Box Replacement in Nyewood

Nyewood is a village in Harting parish, west of Midhurst and close to Rogate. Planning an extension, a new kitchen or simply tired of an old fuse box? Either way, a new consumer unit costs a fixed price, and surge protection and full testing are part of it.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Nyewood

Fuse box services for Nyewood

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Homes of several ages

Early consumer units that are now past their best

As a village rather than a hamlet, Nyewood has homes of several ages, and the consumer units inside them vary too. Houses built or rewired between the 1960s and the 1980s often kept their original board, with cartridge fuses or early breakers and no RCD protection on lighting or sockets. Those boards have served well, but they were never designed for the way households use electricity now.

A modern board adds RCD protection throughout and Type 2 surge protection as standard. Most family homes find enough room for a new kitchen, an electric shower or a garden office in either a dual RCD board with 10 ways at £495, or an RCBO board with 10 to 12 ways at £695.

  • RCD on lighting and sockets
  • Room for new kitchen circuits
  • Breakers in place of fuses
  • Board sized for your plans
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for NyewoodExtending or renovating
Extending or renovating

Why the board often changes before the builders finish

When an extension, loft conversion or new kitchen adds circuits, those circuits need RCD protection and a board that can safely take them. An older consumer unit frequently cannot, either because it has no spare ways or because it offers no RCD protection at all. Whoever wires the new circuits may then be unable to certify their work until the board is replaced.

We fit the new board at whichever point suits your build, often early on so the new circuits can be connected straight to it. We notify Building Control of the work under Part P, and your certificate follows within 48 hours, ready to go with the completion paperwork.

  • Fitted around your build schedule
  • Spare ways for new circuits
  • Part P notification handled
  • Certificate for your completion file
Getting to you

Reaching Nyewood

From Brighton & Hove we come out through Midhurst and along the A272 towards Rogate, then turn off onto the lanes. You pay nothing for the miles. Send your board photos with a note of any building work planned, and we will slot in around your builder's programme. Urgent faults are treated as same day jobs where possible, so call us.

Nyewood at a glance

  • ParishHarting
  • CouncilChichester District Council
  • PostcodeGU31
  • Nearest townMidhurst, 8.5 km east
  • Boards we expectOlder units, often no RCD
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Nyewood

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Nyewood. Full breakdown on the pricing page.

Nyewood questions

Asked in Nyewood

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Not in every case, but often. The new circuits need RCD protection and somewhere suitable to connect, and an older board may offer neither. If your builder or designer has flagged the board, send us a photo. We will tell you whether replacement is really needed and give you a fixed price either way.

We do. Replacing a consumer unit is notifiable work under Part P, and as a Part P registered firm we notify it on your behalf, with nothing extra to pay. Within 48 hours the Electrical Installation Certificate reaches you by email, with a Building Regulations compliance certificate following separately for your records.

Yes, and it usually makes sense. Fitting the board early means new circuits can be connected and tested as the work progresses, and any cable route to a new board position can be chased in before walls are finished. Moving the board at the same time as replacing it adds £250 to the price.

Ready when you are

Book your Nyewood fuse box replacement

Building work coming up in Nyewood? Snap the fuse box and message it to 0333 360 8691 so we can price the new board to fit your plans.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.