Planning for heat pumps and solar

Fuse Box Replacement in Honey's Green

Framfield parish takes in Honey's Green, a small hamlet south east of Uckfield. Homes here sit among fields and lanes, and where a house is off mains gas the electrics carry more of the load. Moving from old fuses to a modern consumer unit costs a fixed sum, and we lay the new board out with the next step in mind.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Honey's Green

Fuse box services for Honey's Green

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Scattered rural homes

Small hamlet, varied houses

As a hamlet, Honey's Green is a handful of homes rather than a village street, and each one tends to have its own story: an older cottage, a farmhouse, a converted outbuilding or a later house on its own plot. Their fuse boards vary just as much, from wire fuses to boards extended several times as kitchens and bathrooms were updated.

We look at the whole installation, not just the box on the wall. Every circuit is tested, the earthing and bonding are checked, and the new board is sized with spare ways. Every circuit gets its own protection on an RCBO board, which costs from £695 when it has 10 to 12 ways.

  • Wire fuses replaced
  • Earthing and bonding checked
  • Spare ways for later
  • 10 to 12 way RCBO from £695
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for Honey's GreenOff mains gas
Off mains gas

Moving from oil or LPG to a heat pump

Where a rural home has no mains gas, the next heating system is often an air source heat pump, sometimes alongside solar panels or a battery. Each of these needs its own circuit, and a heat pump installer will want to see a consumer unit with spare capacity, proper protection and a sound earth before connecting anything.

Fitting the board first keeps the heating project moving. We leave protected ways for the heat pump and any later additions, check the rating of the main fuse, and tell you if UK Power Networks should be asked about the supply. If you already have a heat pump quote, send it with your board photos.

  • Ways kept for heat pump circuits
  • Main fuse rating checked
  • Ready for solar or a battery
  • Supply questions raised early
Getting to you

Honey's Green appointments

For us, Honey's Green is a trip out into the Wealden countryside. Our installers come out from Brighton & Hove past Lewes and on towards Uckfield, then through the lanes of Framfield parish. Send us the meter and consumer unit in pictures, name the hamlet in your message, and we will work out a fixed quote. Lost power entirely? Ring, and we will make a real effort to come that day.

Honey's Green at a glance

  • ParishFramfield
  • CouncilWealden District Council
  • PostcodeTN22
  • Nearest townUckfield, 4.7 km north west
  • Common reason to upgradeHeat pump or extra circuits
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Honey's Green

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Honey's Green. Full breakdown on the pricing page.

Honey's Green questions

Asked in Honey's Green

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Forward whatever the installer wrote, plus a picture of the meter and another of the board. Usually the issue is no RCD protection, no spare ways or doubts about the earthing. We fit a new consumer unit with a protected way ready for the heat pump, test the whole installation and email a certificate the installer can rely on.

Look for a switch on the board marked RCD, usually with a small button labelled T or Test. If every switch is a plain breaker or a fuse carrier, you probably have no RCD protection at all. From one clear photo by text, we can identify it and tell you the replacement cost.

Yes. Every board change already includes testing of the whole installation, and if you want a full Electrical Installation Condition Report as well, it costs £99 alongside any board. Booked by itself, an EICR is priced from £175 up to £350, with larger properties at the upper end. Doing both together means one visit instead of two.

Ready when you are

Book your Honey's Green fuse box replacement

Planning a heat pump, or simply tired of the old fuses? Pictures of the board on 0333 360 8691 are what a fixed Honey's Green price is built on, travel already counted in.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.