Rural supplies in Sidlesham parish

Fuse Box Replacement in Highleigh

Highleigh lies in Sidlesham parish, north of Selsey in a rural setting. Rural homes can have supplies that differ from town houses, so we check your earthing and incoming cable from photos before we fix the price of a new consumer unit.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Highleigh

Fuse box services for Highleigh

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Houses beside the fields

What we tend to find in Highleigh homes

Highleigh, a small village, is made up of individual houses and bungalows spread out beside farmland rather than rows of matching homes. They are of different ages and most have been updated by different owners at different times. That is why we ask for photos of the board, meter and main earth: in a place like this, no two installations look quite the same.

Common findings include old boards with no RCD, a mixture of breaker brands added over the years, and earthing conductors smaller than today's standard. All of that is put right as part of the board change, and every circuit is tested before the job is signed off.

  • Missing RCD cover fixed
  • Mixed old breakers replaced
  • Earthing conductors upgraded
  • Every circuit signed off
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for HighleighOverhead lines and earth rods
Overhead lines and earth rods

TT earthing and overhead supplies

Rural properties like those around Highleigh are sometimes fed by overhead lines and do not take an earth from the network. Instead they rely on their own earth rod, an arrangement called TT. On a TT system, RCD protection is not optional: it is what makes the earthing work, and the rod itself needs testing to make sure it is still doing its job.

On a TT supply, every board change includes a resistance reading on the earth electrode, and you will hear from us if a new rod is needed. Lightning and switching surges also reach overhead lines more easily, which is one reason every board we install has a Type 2 surge protector built in.

  • Earth rod resistance measured
  • RCD protection for TT systems
  • Surge protection included
  • Overhead supplies understood
Getting to you

Reaching Highleigh's lanes

From the A27 at Chichester we head south on the B2145 towards Sidlesham, then into the lanes. We book most replacements a few days out, once the photo quote is agreed. Storms and faults can leave a board dead or tripping constantly; if that happens, phone us, and we aim to be there that day.

Highleigh at a glance

  • ParishSidlesham
  • CouncilChichester District Council
  • PostcodePO20
  • Nearest townSelsey, 4.8 km south
  • Earthing to expectTT on some rural supplies, PME elsewhere
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Highleigh

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Highleigh. Full breakdown on the pricing page.

Highleigh questions

Asked in Highleigh

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Look near your meter. If the main earth cable connects to the network's cable head, you probably have a PME or cable sheath earth. If it leaves the house and goes into the ground, often to a rod under a small cover outside, it is likely TT. Send us a photo of that area and we will confirm it before quoting.

A new board cannot prevent network power cuts, which are for UK Power Networks to fix. What it can do is help your own installation cope: surge protection shields electronics from spikes, and individual circuit protection makes it easier to see whether a fault is inside your home. For a power cut, call 105.

The board prices are the same: from £425 for a dual RCD unit and £625 for full RCBO. On a TT system, testing the earth rod is included in the work. If the rod is missing, damaged or reads too high, we explain what is needed and price it before any extra work goes ahead.

Ready when you are

Book your Highleigh fuse box replacement

What kind of supply you have shows up in photos of your board, meter and main earth, which is why a fixed Highleigh price starts with those three pictures arriving at 0333 360 8691.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.