
Fuse Box Replacement in Hadlow Down
Hadlow Down is a village and parish in its own right, north west of Heathfield, sharing the TN22 postcode with Uckfield. Every fuse box replacement in the village is priced up front and fixed. If you have solar panels or are thinking about them, we choose a board with room for the generation and battery circuits.
- Part P registered installers
- Fitted and certified in a day
- Surge protection as standard
- Fixed prices, no surprises
- 17+ YearsEst. 2009 in Brighton & Hove
- 6 Year GuaranteeWorkmanship, every board
- Specialist TeamDirectly employed installers
- Free QuotationSurvey or photo, no call out fee
- 2,400+Boards replaced since 2009
Fuse box services for Hadlow Down
RCBO Consumer Units
AFDD Consumer Units
Surge Protection
Fuse Box Relocation
Landlord Fuse Box Upgrades
EICR Testing
Transparent Pricing
Free Fixed Quotes

The Hadlow Down housing mix and its consumer units
Hadlow Down is a rural High Weald village of detached houses, cottages and some later homes. Many houses like these have been modernised in stages, so the board inside may be newer than the wiring it serves, or the other way round. We look at both before recommending anything, because a new board only performs as well as the circuits behind it.
If the wiring tests well, swapping the board alone does the job, for £425 on a dual RCD board, or £495 where 10 ways are needed. Where insulation readings are poor, we tell you before fitting, because a new RCD board on tired wiring can trip repeatedly until the underlying fault is found.
- Wiring tested, not just the board
- Dual RCD 6 way from £425
- 10 way dual RCD £495
- Weak circuits reported first

Solar PV, batteries and a board that suits them
A solar PV system feeds power into the house through its own circuit, usually connected at the consumer unit. A home battery may add another. Both need suitable protection, and the board must be clearly labelled to warn that there is more than one source of supply. An older fuse box rarely has the space or the right devices for this.
If you already have panels at your Hadlow Down home, we reconnect the PV circuit to the new board, test it and fit the correct warning labels. If panels or a battery are planned, we leave space for them. With an inverter connected, the Type 2 surge protection we include as standard earns its place too.
- Existing PV reconnected and tested
- Ways left for a future battery
- Dual supply labels fitted
- Surge protection as standard
Travelling up to Hadlow Down
Our route to Hadlow Down takes us into the countryside north west of Heathfield. Wherever you are in Sussex, the trip from Brighton & Hove costs you nothing extra, and Hadlow Down is no exception. Photos of the board, plus the inverter if you have solar, let us price the job. For a fault, ring and we aim to have someone with you that day.
Hadlow Down at a glance
- ParishHadlow Down
- CouncilWealden District Council
- PostcodeTN22
- Nearest townHeathfield, 6.2 km to the south east
- Planning aheadSolar PV and home batteries
A new consumer unit, fitted in a day
- 01The first hour
Protect, isolate, strip out
- 02Hours two to four
Fit and terminate the new board
- 03Hour five
Test every single circuit
- 04The final hour
Energise, label, walk through
Not sure how many ways your board needs?
Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.
Fixed prices in Hadlow Down
Dual RCD board
6 way, from£425- Ideal for 1 to 2 bed flats
- 10 way from £495
- Surge protection included
High integrity
12 way, from£575- 3 to 4 bed houses
- Critical circuits isolated
- Surge protection included
Full RCBO board
8 way, from£625- 10 to 12 way from £695
- 14 to 16 way from £795
- Our recommendation
RCBO + AFDD
10 way, from£1,095- 14 way from £1,295
- HMOs & period terraces
- Selected circuits from £845
No travel charge to Hadlow Down. Full breakdown on the pricing page.
Asked in Hadlow Down
Call for a straight answer from an installer, not a call centre.
Call 0333 360 8691No. Replacing the consumer unit does not change your generation meter, your export arrangement or the panels themselves. We isolate the PV circuit safely, reconnect it to the new board and test it. Keep the new certificate with your solar paperwork, as it records the change to the installation.
Yes, provided the board has a spare way and the battery installer is happy with the arrangement. Tell us the likely system size if you know it, and we will leave suitable space. Some batteries connect through the solar inverter rather than a separate circuit, which the battery installer will confirm.
The inverter shuts down when it loses the mains supply, as it is designed to, so no power is fed into the house during the work. We isolate the PV circuit properly before starting, and once the new board is in and tested, the inverter reconnects and resumes generating on its own after a short delay.
Also covering places near Hadlow Down
Book your Hadlow Down fuse box replacement
Mention any solar or battery plans alongside a picture of the Hadlow Down fuse box, sent on 0333 360 8691, so the board we price is matched to them.
- Call, 8am to 8pm0333 360 8691
- CoverageHadlow Down: TN22