Countryside south of Horsham

Fuse Box Replacement in Sedgwick

Out in open country south of Horsham lies Sedgwick, a hamlet in Nuthurst parish. Plenty of properties out here have more than a house on the plot, so when we swap the fuse box we look at everything it feeds, from the kitchen to the furthest outbuilding.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Sedgwick

Fuse box services for Sedgwick

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Houses with land around them

One supply, several buildings

Sedgwick has no high street. It is a handful of homes set among the fields and woods between Horsham and Nuthurst village, and on plots like these the house is rarely the only building drawing power. Garages, stores, stables and studios have often been wired one at a time, sometimes from a spare fuse, sometimes from a cable laid across the garden years ago.

We trace each of those feeds before the old board comes out. Anything still in good order is reconnected to its own protected way on the new consumer unit, and anything unsafe is written up clearly, so you know exactly what it would take to put right.

  • Every outgoing feed traced
  • Garden cables tested
  • Unsafe feeds reported plainly
  • Each building on its own way
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for SedgwickStables, studios and stores
Stables, studios and stores

Keeping a fault in the yard out of the house

A long cable to a stable block or workshop needs more thought than a socket circuit indoors. It has to be sized for both the load and the distance, protected properly at the board, and fitted with residual current protection that will not plunge the whole house into darkness when a wet floor or tired heater upsets it.

On the new board each outbuilding feed gets its own RCBO, so a fault out by the stables stays out there. Where a building would be better served by a small board of its own, we say so before the job and include it in your fixed quote, so the figure you agree is the figure you pay.

  • Own RCBO for each outbuilding
  • Cable size checked for distance
  • House lights stay on
  • Agreed price, no surprises
Getting to you

A short run south of Horsham

The last few minutes of our journey take us south out of Horsham and into the lanes. Pictures of the consumer unit, and of any switches out in the outbuildings, let us settle the price before you book. If the board has failed outright, ring any day of the week; our aim is to be with you that same day.

Sedgwick at a glance

  • ParishNuthurst
  • CouncilHorsham District Council
  • PostcodeRH13
  • Nearest townHorsham, 3.3 km north
  • Common extrasGarages, stables, garden rooms
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Sedgwick

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Sedgwick. Full breakdown on the pricing page.

Sedgwick questions

Asked in Sedgwick

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Usually. We disconnect it, test the insulation and continuity of the cable, and if the readings are sound it goes back onto its own protected way on the new board. If the cable is damaged, undersized or was never properly protected, we show you the results and explain the options rather than quietly reconnecting something unsafe.

No. A store with a light and a couple of sockets can run happily from a single RCBO back in the house. A stable block with heaters, or a studio with electric heating and power tools, may justify a small board of its own. We look at the load and the length of the cable run, then recommend whichever is sensible.

An Electrical Installation Certificate listing every circuit and its test results, emailed within 48 hours. A board change is notifiable under Part P, so we also notify Building Control for you, and a compliance certificate follows separately. Keep both with the deeds, because buyers and insurers often ask to see them.

Ready when you are

Book your Sedgwick fuse box replacement

Workshop, stable or studio running off the house? A fixed Sedgwick price starts with photos showing the board and the outbuilding switches, sent by text on 0333 360 8691.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.