Old village core, east of Uckfield

Fuse Box Replacement in Framfield

Framfield is a village just east of Uckfield and gives its name to a Wealden parish that also takes in Blackboys. Around its church and along the village street are older houses that need a careful hand when the fuse box is changed, alongside later homes with tired plastic boards.

  • Part P registered installers
  • Fitted and certified in a day
  • Surge protection as standard
  • Fixed prices, no surprises
  • 17+ YearsEst. 2009 in Brighton & Hove
  • 6 Year GuaranteeWorkmanship, every board
  • Specialist TeamDirectly employed installers
  • Free QuotationSurvey or photo, no call out fee
  • 2,400+Boards replaced since 2009
What we do in Framfield

Fuse box services for Framfield

Full RCBO consumer unit with surge protection, neatly wired and labelled in a Sussex home
Our standard installationFull RCBO board with surge protection
Old and newer side by side

Framfield homes and the boards inside them

Framfield mixes period cottages and houses near the church with later homes on the roads around them. The older buildings often had electricity added long after they were built, with cables run through thick walls, under floors and behind beams. The newer homes tend to have their original consumer unit, sometimes plastic, sometimes with only part of the house on an RCD.

Whichever kind of house you have, most boards go in within 4 to 6 hours, with the power off for part of that time. No circuit is reconnected until it has been tested, and the readings are recorded on your Electrical Installation Certificate, which we email inside 48 hours. A full RCBO board, where a fault on one circuit leaves the others on, starts from £625.

  • Period cottages and later homes
  • Part RCD cover put right
  • Most boards fitted in 4 to 6 hours
  • Certificate within 48 hours
Large distribution board being installed with cable tray and busbar, levelled and ready for termination
Specified for FramfieldCharacter buildings in the village
Character buildings in the village

Careful board changes in Framfield's older houses

Period houses deserve care. In the older parts of Framfield, we plan the work so that the new consumer unit goes where the old board was wherever that is sensible, reusing existing cable routes rather than chasing new ones into old plaster or timber. Where a cable has to be extended, we look for a route that leaves the fabric of the building alone.

If your house is listed and you plan anything more than a straight swap, such as new cable runs through historic walls, speak to Wealden District Council first. We can set out in writing exactly what the work involves, which makes that conversation much easier.

  • Existing cable routes reused
  • Minimal disturbance to old walls
  • Written scope on request
  • Dust sheets and a tidy finish
Getting to you

Out along the road from Uckfield

Our route from Brighton & Hove runs up through Lewes to Uckfield, and Framfield is then a short drive east of the town. You pay nothing for our travel. Board photos let us fix a price and book a date, or if half the house has gone dark, call us and we will move fast to reach you that day.

Framfield at a glance

  • ParishFramfield
  • CouncilWealden District Council
  • PostcodeTN22
  • Nearest townUckfield, 2.6 km to the west
  • Housing mixPeriod cottages and later homes
How long does it take?

A new consumer unit, fitted in a day

  1. 01
    The first hour

    Protect, isolate, strip out

  2. 02
    Hours two to four

    Fit and terminate the new board

  3. 03
    Hour five

    Test every single circuit

  4. 04
    The final hour

    Energise, label, walk through

Not sure how many ways your board needs?

Text a photo of your current fuse box to 0333 360 8691 and we will tell you, with a fixed price, today.

Send a photo
Pricing guide

Fixed prices in Framfield

Dual RCD board

6 way, from£425
  • Ideal for 1 to 2 bed flats
  • 10 way from £495
  • Surge protection included
Get a quote

High integrity

12 way, from£575
  • 3 to 4 bed houses
  • Critical circuits isolated
  • Surge protection included
Get a quote
Most popular

Full RCBO board

8 way, from£625
  • 10 to 12 way from £695
  • 14 to 16 way from £795
  • Our recommendation
Book a survey

RCBO + AFDD

10 way, from£1,095
  • 14 way from £1,295
  • HMOs & period terraces
  • Selected circuits from £845
Get a quote
Surge protection retrofit £165 Relocation with a new board add £250 Standalone relocation £395 EICR with any board £99 Standalone EICR £175 to £350

No travel charge to Framfield. Full breakdown on the pricing page.

Framfield questions

Asked in Framfield

Still not sure?

Call for a straight answer from an installer, not a call centre.

Call 0333 360 8691

Rarely. In most board changes the new consumer unit connects to the cables already running to the old board, so nothing needs chasing into walls or beams. If a circuit is too short to reach, we extend it with a proper joint in an accessible place. We tell you beforehand if any making good will be needed.

It is possible. Some fuse boxes from before the 1980s used asbestos in small parts, such as the flash pads inside rewireable fuse carriers or the panel behind the board. We look for the signs in your photos and again on arrival. If we suspect asbestos, we stop and advise testing before the old board comes off, rather than taking a chance.

Both lose mains power while the board is changed, so expect the router to be off for part of the day. An intruder alarm with a backup battery should keep running, but a monitored system may report the mains failure, so warn your alarm company beforehand. Everything is reconnected and checked before we leave.

Ready when you are

Book your Framfield fuse box replacement

Cottage near the church or later house, any Framfield home can get a fixed price; just text a few fuse box pictures to 0333 360 8691.

Request a free quote

No obligation, no call out fee. We reply the same day.

Prefer a photo quote? Text a picture of your fuse box to 0333 360 8691.